Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13603010

- Product Categories
- Friendly Links
Information Name: | Jinan how to avoid cracking carborundum wearable Floor |
Published: | 2014-11-21 |
Validity: | 30 |
Specifications: | |
Quantity: | 100000.00 |
Price Description: | |
Detailed Product Description: | Jinan how to avoid carborundum wearable Floor cracking now most customers are worried carborundum wearable Floor cracking phenomenon occurs, how to avoid such a phenomenon? This requires good ground concrete this link, then remove the floating pulp --- use the installation disc mechanical trowel (template edge wipe wood) even the concrete surface laitance destroyed. --- Spreading material will provide 2/3 the amount of wear resistant material evenly spread over the surface of the initial setting of the concrete stage of completion of the first to spread the job. After the wear resistant material absorbs moisture, a second spreading operation (1/3 material). Disc operations --- to be absorbed moisture resistant materials, and then at least twice a mechanical installation disc trowel job. Mechanical trowel job --- in later operations, depending on the hardness of the concrete situation, at least not the installation disc mechanical trowel job. Changes in operating speed and the angle of mechanical machinery trowel trowel should be the case, as the hardening of concrete station adjustment. Mechanical trowel jobs should be criss-crossing. Eventually modified surface finish the job --- resistant materials is the use of mechanical trowel or hand trowel processing. --- Floor conservation methods the company uses special conservation agent or film conservation, Exalted is strictly prohibited during the curing time 72 hours, to prevent evaporation of surface moisture, abrasion-resistant material to protect the strength of steady growth. Emery resistant floor is not relying solely on a single link and complete, with the overall need to separate between any steps are not missing. In order to avoid long-awaited emery resistant floor cracking, dusting from the sand, uneven color and other phenomena, choose Zerui New Material Technology Co., Ltd., as Zerui ground for you to do a comprehensive guidance and services made to your satisfaction to the ground. If you have questions carborundum wearable Floor want advice, please get in touch with Zerui. For more information please check www.haodimian.com or micro-channel contact 3083688233. Contact: (channels) manager Yao Tel: 18265461032 Address: Economic Development Zone Zerui guangrao New Material Technology Co., Ltd. unity Road 680 |
Admin>>>
You are the 5794 visitor
Copyright © GuangDong ICP No. 10089450, New Material Technology Co., Ltd. Shandong Zerui All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 5794 visitor
Copyright © GuangDong ICP No. 10089450, New Material Technology Co., Ltd. Shandong Zerui All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility